Guangzhou C'estbon shop Simplified ChineseTraditional ChineseEnglish Version
Index About Us Promotion News Reports Honor
drops
Our's C'estbon
¿Í»§µÇ¼
Username
Password
Promotion is going on
C'estbon's honor,devoting 20years
C'estbon Shop
Five Star Service
Craft Process
Service Commitment
The China South distributes the diagram
¡¡>>Description

Pursue the perfect Cestbon of quality2


provenance:Gz YibaoDate Added:2006-02-24
Have already cleaned thoroughly, the alexipharmic bucket walk up the bottle packs the line, reporter detection, whole pack the process is an automation completely, can't see a worker inside.The explains toward reporter, contacting the person more little, were is more little by the possibility of pollution, for pursue zero pollution, the Cestbon automate production line possibly.And, an air that packs the car is through special decontamination processing of, its germs content is very small.End, the bottle packs the good barrel water to pass by to stick the mark, and then can stand down the production line through the strict examination of two procedures.

The visit finishes the barrel water production line, we arrive at the bottled water of the whole closing production car.The says to the reporter, the bottled water is similar to the production craft and quantities of the barrel water control standard, but what bottled water use is a, the barrel water use of is a, the bottle of another bottled water is a sexual.

The bottled water produces the car, across the glass window of seal completely the room, the reporter see, a machine takes a lot of empty bottles to revolve in the high speed, after these empty bottle up the production line bottle pack, presses the cover.The tells the reporter, the machine that that high speed revolve is the bottle-washer son of, the PET bottle is after there drive purified water and ozones cleaned, just can pack with the bottle.Same, bottle the cover also wants here has been cleaned and disinfected.Similar to barrel water, the finished product that stands down the bottle to pack the line then can go into the box, packing after also wanting through layer after layer check.

Will take charge of to extend each link

At in the whole visit process, the reporter discovers each car all have the specialized person to be responsible for the hygiene, at any time clean off the water on the ground.The the spot introduces toward reporter, Cestbon to not only produce the concern of the environment is these, even meticulous arrive whether screen window is tight and each or not to put out the gnat fly light whether normal work etc..

Between each the Cestbon each car, the reporters all see hang the post homework book up the wall, each post operates the standard that all very clear own link of personnels to attain.For pursuing the quality perfect, the Cestbon manages the foundation of the system request in the full implementation ISO9000 up, built up own SMP management system, that system is to each links within production lines concrete, strict request.

Guaranteed By (2005)(440240928) QS440106010358,QS440306010365 ISO9001:2000 7x24 Hours Hotline For Ordering and Consultating: 33083536 13688859392
Copyright © 2000-2006 yibao-shui.com, All rights reserved